CopperStocks original
Ivanhoe Electric hits 123.6 metres of 0.91% copper at Gleeson
Ivanhoe Electric's (TSX: IE; NYSE-A: IE) first holes on private land at its Gleeson project in southeastern Arizona intersected copper-gold-silver mineralization in two zones starting about 600 metres deep.
Hole CGD26-TR-003 cut 123.60 metres grading 0.91% copper, 0.44 gram gold per tonne and 5.27 grams silver starting 601.70 metres downhole, including 71.03 metres of 1.38% copper, 0.52 gram gold and 6.73 grams silver from 640.32 metres, Ivanhoe Electric said on Thursday. Hole CGD26-TR-008, about 250 metres to the southwest, returned 381.66 metres of 0.34% copper, 0.29 gram gold and 1.07 grams silver from 587.85 metres, including 16.20 metres of 1.04% copper, 0.27 gram gold and 1.38 grams silver from 729.00 metres.
"Our Gleeson Copper-Gold Project in Arizona has suddenly become the Company's highest priority exploration project. These initial drill results are some of the best copper-gold-silver intercepts drilled in the western United States in the last ten years," executive chairman Robert Friedland and CEO Taylor Melvin said in the release.
The company said its focus is now on delineating the continuity and extensions of the two zones. The upper zone is a breccia logged over an area of about 500 by 500 metres from 600 metres depth and open in several directions. Below about 1,000 metres, a second zone of intrusive, skarn and carbonate-replacement copper-gold-silver-zinc mineralization has been logged over 800 metres north to south and 600 metres east to west, with what the company calls a strong vector to the west.
Assays pending
True widths are unknown. No metallurgical testwork has been completed. The release gives no mineral resource for Gleeson.
Holes TR-008 and TR-009 intersected carbonate-replacement zones from about 1,250 metres, and TR-009 and TR-010 hit the breccia from around 600 metres, but those observations of sulphides in core are visual only, with assays pending. The company cautioned that visual observations are not a substitute for laboratory analysis and that the presence of sulphide minerals does not indicate grade.
Of 11 completed holes, Ivanhoe Electric has full assays for seven and partial results for two. Two drill rigs are active, and the company plans to complete 16,000 metres of drilling by the end of the year in a program that began in November 2025.
Bisbee neighbour
Gleeson sits in the Courtland-Gleeson mining district, about 28 miles north of Bisbee. Ivanhoe Electric began acquiring mineral and surface rights there in 2024 and controls more than 19,606 acres of mineral rights and 2,033 acres of private surface rights. All its drilling is on private land.
Mines in the Bisbee district produced almost continuously from 1880 to 2013, extracting more than 207 million tonnes of ore that yielded about 8.2 billion pounds of copper, 2.8 million ounces of gold and 105 million ounces of silver, according to the release. Bisbee is not part of Gleeson, and its mineralization and production are not indicative of mineralization or potential at Gleeson, the company said.
Ivanhoe Electric expects assays from the carbonate-replacement zones in TR-008 and TR-009 before the end of the year and plans an investor conference call on Gleeson once further results arrive.